  • Gujarat: Additional Surcharge (state DISCOMs)
    ₹0.76/kWh → ₹0.99/kWh ▲ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA ₹6.6 lakh/yr costlier · group captive no change
  • Gujarat: Banking charge on banked energy (GEOA)
    ₹1.50/kWh → ₹1.00/kWh ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA ₹2.2 lakh/yr cheaper · group captive ₹2.2 lakh/yr cheaper
  • Maharashtra — Tata Power-D (Mumbai): InSTS transmission loss (MERC trajectory)
    3.28% → 3.26% ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA no material change · group captive no change
  • Maharashtra — Tata Power-D (Mumbai): InSTS transmission charge — RE medium/long-term OA, per-unit option
    ₹1.16/kWh → ₹1.04/kWh ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA ₹3.5 lakh/yr cheaper · group captive ₹3.5 lakh/yr cheaper
  • Maharashtra — MSEDCL: InSTS transmission loss (MERC trajectory)
    3.28% → 3.26% ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA no material change · group captive no change
  • Maharashtra — MSEDCL: InSTS transmission charge — RE medium/long-term OA, per-unit option
    ₹1.16/kWh → ₹1.04/kWh ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA ₹3.5 lakh/yr cheaper · group captive ₹3.5 lakh/yr cheaper
  • Gujarat: STU (GETCO) transmission charge — long/medium-term OA
    ₹3,918.01/MW/day → ₹3,858.96/MW/day ▼ Regulator document
    Typical factory (6 lakh units/month, 40% solar): third-party PPA ₹0.4 lakh/yr cheaper · group captive ₹0.4 lakh/yr cheaper

For the full current values, see the Open Access Charges Tracker. For analysis of the latest changes, see Gujarat's open-access changes this autumn.

Weekly Regulatory Watch

Get the next change by email.

One short email a week. Unsubscribe at any time.

Please enter a valid email.
Please tick to subscribe.