Gujarat

Gujarat Electricity Regulatory Commission · FY 2026-27All core charges loaded
ChargeValueIn forceConfidenceSource
Charges on open-access power
Cross-subsidy surcharge (HT commercial & industrial)
Order §9.4: "CSS for HT Category = Rs. 1.33/kWh for FY 2026-27" (single HT value).
₹1.33/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document Gujarat Electricity Regulatory Commission (GERC), Case Nos. 2581, 2582, 2583, 2584 of 2025, all dated 25-Mar-2026
Additional surcharge
GEOA Rules 2022 provide that AS is not applicable to GEOA consumers paying fixed charges; GERC continues to determine AS for OA consumers — treat as applicable unless legal advice says otherwise.
₹0.99/kWh
Earlier: ₹0.76/kWh (01 Apr 2026 → 30 Sep 2026)
01 Oct 2026 → 31 Mar 2027 Regulator document GERC Order No. 05 of 2026 dated 10-Sep-2026
Transmission charge (long/medium-term)
MYT year-wise tariff (₹/MW/day): FY26 3,918.01 · FY27 3,858.96 · FY28 3,959.12 · FY29 4,152.37 · FY30 4,080.42. Short-term OA FY27: 37.18 paise/kWh. No later GETCO truing-up order found as of 12-Oct-2026.
₹3,858.96/MW/day
Earlier: ₹3,918.01/MW/day (01 Apr 2025 → 31 Mar 2026)
01 Apr 2026 → 31 Mar 2027 Regulator document GERC GETCO tariff order, Case No. 2419/2024 dated 29-Mar-2025
Wheeling charge
23.52 paise/kWh for the HT network (11/22/33 kV), Table 9-2. LT network: 111.05 paise/kWh.
₹0.2352/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document Gujarat Electricity Regulatory Commission (GERC), Case Nos. 2581, 2582, 2583, 2584 of 2025, all dated 25-Mar-2026
Banking charge ₹1.00/kWh
Earlier: ₹1.50/kWh (21 Feb 2024 → 31 Aug 2026)
01 Sep 2026 → 31 Mar 2027 Regulator document GERC Green Energy Open Access (Sixth Amendment) Regulations, 2026, Reg. 17.6
Scheduling & operating charges
Usually small (fixed ₹/day per transaction). Enter the per-kWh equivalent from the SLDC fee schedule if material.
₹0.00/kWh — Assumption ClimeQuant assumption, Override with project-specific data
Losses
Transmission loss
Latest SLDC monthly actual (Aug-2026). GERC normative loss for FY27 is 3.37%; the last 12 months ranged 3.29–4.06%. Check which figure SLDC applies in OA energy accounting.
3.7% — Assumption SLDC Gujarat (GETCO), Aug-2026 actual 3.70% (Apr–Aug 2026: 3.63, 3.78, 3.97, 4.06, 3.70)
Wheeling (distribution) loss
§9.3 loss table: 6.50% for injection and delivery at 11/22/33 kV (6.71% if delivered at 400 V). The prose under the table says 6.71% for HT; the table and the CSS formula use 6.50%. Flagged for review.
6.5% 01 Apr 2026 → 31 Mar 2027 Regulator document Gujarat Electricity Regulatory Commission (GERC), Case Nos. 2581, 2582, 2583, 2584 of 2025, all dated 25-Mar-2026
Concessions for renewables
CSS concession 0% — Assumption ClimeQuant assumption, Override with project-specific data
Wheeling concession 0% — Assumption ClimeQuant assumption, Override with project-specific data
Alternative to open access
DISCOM green power tariff premium ₹0.75/kWh 01 Apr 2026 → 31 Mar 2027 Order reported Gujarat Electricity Regulatory Commission (GERC), 25-Mar-2026
Grid tariff for comparison (HT industry)
Energy charge
≤ 500 kVA ₹4.00/kWh
≤ 2,500 kVA ₹4.20/kWh
above ₹4.30/kWh
— Regulator document Gujarat Electricity Regulatory Commission (GERC), Case Nos. 2581, 2582, 2583, 2584 of 2025, all dated 25-Mar-2026
Base FPPPA ₹2.45/kWh — Regulator document Gujarat Electricity Regulatory Commission (GERC), Case Nos. 2581, 2582, 2583, 2584 of 2025, all dated 25-Mar-2026

Odisha

Odisha Electricity Regulatory Commission · FY 2026-271 charge(s) not loaded yet
ChargeValueIn forceConfidenceSource
Charges on open-access power
Cross-subsidy surcharge (HT commercial & industrial)
TPCODL EHV ₹1.5183/kWh · HT ₹0.5642/kWh
TPNODL EHV ₹1.4273/kWh · HT ₹0.0163/kWh
TPWODL EHV ₹1.1823/kWh · HT ₹0.1726/kWh
TPSODL EHV ₹2.5053/kWh · HT ₹1.0602/kWh
— Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Additional surcharge
OERC: no additional surcharge over CSS for FY 2026-27.
₹0.00/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Transmission charge (long/medium-term) ₹5,760.00/MW/day — Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Wheeling charge
TPCODL ₹1.1656/kWh
TPNODL ₹1.8086/kWh
TPWODL ₹1.209/kWh
TPSODL ₹1.9732/kWh
— Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Banking charge
Load from OERC GEOA Regulations.
Not loaded yet — Not loaded ClimeQuant assumption, Override with project-specific data
Scheduling & operating charges
Usually small (fixed ₹/day per transaction). Enter the per-kWh equivalent from the SLDC fee schedule if material.
₹0.00/kWh — Assumption ClimeQuant assumption, Override with project-specific data
Losses
Transmission loss 3% — Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Wheeling (distribution) loss 7% — Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Concessions for renewables
CSS concession 50% — Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025
Wheeling concession 25% — Regulator document Odisha Electricity Regulatory Commission (OERC), OERC Case Nos. 126, 127, 130, 131, 134, 135, 137, 138 of 2025

Maharashtra — MSEDCL

Maharashtra Electricity Regulatory Commission · FY 2026-27All core charges loaded
ChargeValueIn forceConfidenceSource
Charges on open-access power
Cross-subsidy surcharge (HT commercial & industrial)
Same rate at EHV and at 33/22/11 kV (₹2.07/kVAh). The MYT order had ₹1.79 at EHV for FY 2026-27; the 25-Mar-2026 order replaced it before it took effect.
₹2.11/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document MERC order in Case No. 75 of 2025 dated 25-Mar-2026
Additional surcharge
MERC did not approve an additional surcharge for the 5th control period (para 7.36.28). GEOA consumers paying fixed charges are exempt anyway (DOA 2nd Amendment, Reg. 7). In Case 75 of 2025 a developer alleged MSEDCL bills AS to group captive users; check actual bills.
₹0.00/kWh 01 Apr 2025 → 31 Mar 2030 Regulator document MERC MSEDCL MYT order, Case No. 217 of 2024 dated 28-Mar-2025
Transmission charge (long/medium-term)
Two times the short-term rate of ₹0.52/kWh (Table 20), as the DOA Regulations proviso quoted in para 5.6.6 requires. Para 5.6.9 lets RE MTOA/LTOA choose ₹297.22/kW/month instead, which costs more at solar or wind utilisation. FY 2025-26: 2 × ₹0.58.
₹1.04/kWh
Earlier: ₹1.16/kWh (01 Apr 2025 → 31 Mar 2026)
01 Apr 2026 → 31 Mar 2027 Regulator document MERC InSTS order, Case No. 208 of 2024 dated 28-Mar-2025
Wheeling charge
One HT rate for 33/22/11 kV, set per kVAh in the FY 2026-27 tariff schedule (p.100, Table 9 p.83); the MYT order had ₹0.60. No wheeling at EHV (MYT order para 7.34.18). LT ₹1.60. Data centres and semiconductor units get 10% off. Confirm with MSEDCL whether open-access wheeling is billed per kWh or per kVAh.
EHV ₹0.00/kWh
HT ₹0.81/kWh
01 Apr 2026 → 31 Mar 2027 Regulator document MERC order in Case No. 75 of 2025 dated 25-Mar-2026
Banking charge
Reg. 20.4. Since 1-Jul-2025 banking is settled monthly and slot-wise: solar-hour banking can be drawn only in solar hours (Case 75 of 2025, paras 18.16–18.21). APTEL stayed bills under the new banking rules for the appellants only (APL 130 of 2026, interim order 27-Apr-2026). A draft MERC DOA Regulations 2026 proposing a two-part banking charge is not yet in force.
8% of banked energy, in kind 10 Nov 2023 → 31 Mar 2027 Regulator document MERC DOA (Second Amendment) Regulations 2023, Reg. 20.4
Scheduling & operating charges
Usually small (fixed ₹/day per transaction). Enter the per-kWh equivalent from the MSLDC fee schedule if material.
₹0.00/kWh — Assumption ClimeQuant assumption, Override with project-specific data
Losses
Transmission loss
Table 29. Open-access energy accounting may use MSLDC's measured weekly losses instead; check.
3.26%
Earlier: 3.28% (01 Apr 2025 → 31 Mar 2026)
01 Apr 2026 → 31 Mar 2027 Regulator document MERC InSTS order, Case No. 208 of 2024 dated 28-Mar-2025
Wheeling (distribution) loss
MYT order para 7.34.17: 7.5% at HT and 12% at LT for the control period; the 25-Mar-2026 order uses the same values.
EHV 0%
HT 7.5%
01 Apr 2025 → 31 Mar 2030 Regulator document MERC MSEDCL MYT order, Case No. 217 of 2024 dated 28-Mar-2025
Concessions for renewables
CSS concession
No general RE concession. CSS does not apply to green energy used for green hydrogen or ammonia, or to waste-to-energy power (DOA 2nd Amendment, Reg. 7).
0% — Regulator document MERC DOA (Second Amendment) Regulations 2023, Reg. 20.4
Wheeling concession
No general RE concession. A 10% wheeling discount applies only to data centres and semiconductor units (para 7.34.19).
0% — Regulator document MERC MSEDCL MYT order, Case No. 217 of 2024 dated 28-Mar-2025
Alternative to open access
DISCOM green power tariff premium
Para 7.18.7: ₹0.25/kWh over the category tariff.
₹0.25/kWh 01 Apr 2025 → 31 Mar 2030 Regulator document MERC MSEDCL MYT order, Case No. 217 of 2024 dated 28-Mar-2025
Grid tariff for comparison (HT industry)
Energy charge
Billed per kVAh. Demand charge ₹650/kVA/month comes on top.
₹8.44/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document MERC order in Case No. 75 of 2025 dated 25-Mar-2026
Wheeling charge on grid supply
EHV ₹0.00/kWh
HT ₹0.81/kWh
— Regulator document MERC order in Case No. 75 of 2025 dated 25-Mar-2026
Fuel adjustment charge (FAC)
MSEDCL levies FAC monthly; the current rate was not on its website in Oct 2026. Add it if your bill shows it.
Not loaded yet — Not loaded ClimeQuant assumption, Override with project-specific data

Karnataka

Karnataka Electricity Regulatory Commission · FY 2026-27All core charges loaded
ChargeValueIn forceConfidenceSource
Charges on open-access power
Cross-subsidy surcharge, commercial
Common for all ESCOMs, same at 66 kV & above and at HT. Capped at 20% of the category tariff; not levied on captive users (OA Regulations 2025, Reg. 12.c). Not re-computed after the 2026 tariff review.
₹1.89/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
Cross-subsidy surcharge, industrial
Common for all ESCOMs, same at 66 kV & above and at HT. Capped at 20% of the category tariff; not levied on captive users (OA Regulations 2025, Reg. 12.c). Not re-computed after the 2026 tariff review.
₹1.86/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
Additional surcharge
Reported as halved from ₹0.82 to ₹0.40 in KERC's order in OP 29/2025 (Feb-2026); the order itself is not on KERC's website. The FY 2026-27 surcharge (OP 19/2026) is pending and may apply retrospectively. Captive users are exempt (Reg. 12.d).
₹0.40/kWh 01 Mar 2026 → 31 Mar 2027 Being verified Mercom, 18-Feb-2026, on KERC order in OP 29/2025
Transmission charge (long/medium-term)
§6.2.3: ₹2,38,585/MW/month for FY 2026-27. Short-term OA pays 63.35 paise/kWh instead (Table 6.6). The order leaves 11/33 kV-connected users out of its calculation; confirm whether they pay.
₹2,38,585/MW/month 01 Apr 2026 → 31 Mar 2027 Regulator document KERC KPTCL Tariff Order 2025 dated 27-Mar-2025
Wheeling charge
HT-to-HT within one ESCOM (§6.10.6). LT is higher (BESCOM: LT-LT ₹0.67, HT↔LT ₹0.96). If the plant injects in another ESCOM, the drawal ESCOM's HT+LT wheeling and losses apply (§6.10.7). Nothing at 66 kV & above.
BESCOM ₹0.29/kWh
MESCOM ₹0.44/kWh
HESCOM ₹0.38/kWh
GESCOM ₹0.38/kWh
CESC ₹0.39/kWh
01 Apr 2026 → 31 Mar 2027 Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
Banking charge
Reg. 12.e: settled monthly by time-of-day slot; unused energy lapses at month end (REC-eligible). Allowed for 5 years from the effective date; WBAs signed before 2023 lose banking on renewal. The KERC GEOA Regulations 2022 were struck down (High Court, 20-Dec-2024). A draft KERC GNA Regulations 2026 was still a draft on 14-Oct-2026.
8% of banked energy, in kind 26 Mar 2025 → 25 Mar 2030 Regulator document KERC Open Access Regulations 2025, Reg. 12
Scheduling & operating charges
§6.2.8. Short-term: ₹63.83/MW/day.
₹1,941/MW/month 01 Apr 2026 → 31 Mar 2027 Regulator document KERC KPTCL Tariff Order 2025 dated 27-Mar-2025
Losses
Transmission loss
Table 5.3 gives a band of 2.766–2.866%; we use the 2.816% average. Confirm what SLDC applies in energy accounting.
2.816% 01 Apr 2026 → 31 Mar 2027 Regulator document KERC KPTCL Tariff Order 2025 dated 27-Mar-2025
Wheeling (distribution) loss
Same table as the wheeling charge, in kind. CESC's 0.42% is as printed in the order.
BESCOM 2.76%
MESCOM 3.64%
HESCOM 4.33%
GESCOM 2.82%
CESC 0.42%
01 Apr 2026 → 31 Mar 2027 Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
Concessions for renewables
CSS concession
No RE concession. CSS and additional surcharge do not apply to captive users or to waste-to-energy power (Reg. 12.d).
0% — Regulator document KERC Open Access Regulations 2025, Reg. 12
Wheeling concession
No concession for new RE open access. WBAs applied for before Jan-2023 follow older KERC RE orders (wheeling 5% in kind, as KERC quotes the High Court); not modelled.
0% — Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
Alternative to open access
DISCOM green power tariff premium
50 paise/kWh over the normal tariff, for HT and (from Jul-2025) LT consumers buying ESCOM RE beyond their obligation.
₹0.50/kWh 01 Apr 2025 → 31 Mar 2028 Regulator document KERC order dated 18-Jul-2025 (green tariff)
Grid tariff for comparison (HT industry)
Energy charge
Flat, no slabs; demand charge ₹350/kVA/month on top. Disputed: review order RP 8/2025 (3-Mar-2026) re-set FY 2025-26 to 670 paise and ₹365/kVA; whether that carries into FY 2026-27 is unclear, and an appeal is before APTEL. Check a current bill.
₹6.60/kWh 01 Apr 2026 → 31 Mar 2027 Regulator document KERC Combined Tariff Order 2025 dated 27-Mar-2025
FPPCA
Set monthly and by ESCOM. BESCOM also recovers a FY 2024-25 true-up of 56 paise per unit of FY 2024-25 use, in instalments from May 2026.
−₹0.34/kWh
Earlier: −₹0.23/kWh (01 Sep 2026 → 30 Sep 2026)
01 Oct 2026 → 31 Oct 2026 Regulator document BESCOM FPPCA order dated 30-Sep-2026

Maharashtra — Tata Power-D (Mumbai)

Maharashtra Electricity Regulatory Commission · FY 2026-272 charge(s) not loaded yet
ChargeValueIn forceConfidenceSource
Charges on open-access power
Cross-subsidy surcharge, commercial
EHV ₹0.64/kWh
HT ₹0.21/kWh
01 Apr 2026 → 31 Mar 2027 Regulator document Maharashtra Electricity Regulatory Commission (MERC) / Tata Power-D, Tata Power Mumbai Distribution licence area
Cross-subsidy surcharge, industrial
EHV ₹0.23/kWh
HT ₹0.00/kWh
01 Apr 2026 → 31 Mar 2027 Regulator document Maharashtra Electricity Regulatory Commission (MERC) / Tata Power-D, Tata Power Mumbai Distribution licence area
Additional surcharge
Not loaded — check MERC MYT order Case 210 of 2024 / latest AS order.
Not loaded yet — Not loaded ClimeQuant assumption, Override with project-specific data
Transmission charge (long/medium-term)
State-wide InSTS tariff: two times the short-term rate of ₹0.52/kWh (Table 20, para 5.6.6). RE MTOA/LTOA may choose ₹297.22/kW/month instead (para 5.6.9).
₹1.04/kWh
Earlier: ₹1.16/kWh (01 Apr 2025 → 31 Mar 2026)
01 Apr 2026 → 31 Mar 2027 Regulator document MERC InSTS order, Case No. 208 of 2024 dated 28-Mar-2025
Wheeling charge
EHV ₹0.04/kWh
HT ₹0.70/kWh
— Regulator document Maharashtra Electricity Regulatory Commission (MERC) / Tata Power-D, Tata Power Mumbai Distribution licence area
Banking charge
MERC GEOA Regulations — banking charged in kind; load value.
Not loaded yet — Not loaded ClimeQuant assumption, Override with project-specific data
Scheduling & operating charges
Usually small (fixed ₹/day per transaction). Enter the per-kWh equivalent from the SLDC fee schedule if material.
₹0.00/kWh — Assumption ClimeQuant assumption, Override with project-specific data
Losses
Transmission loss 3.26%
Earlier: 3.28% (01 Apr 2025 → 31 Mar 2026)
01 Apr 2026 → 31 Mar 2027 Regulator document MERC InSTS order, Case No. 208 of 2024 dated 28-Mar-2025
Wheeling (distribution) loss
EHV 0%
HT 0.37%
— Regulator document Maharashtra Electricity Regulatory Commission (MERC) / Tata Power-D, Tata Power Mumbai Distribution licence area
Concessions for renewables
CSS concession 0% — Assumption ClimeQuant assumption, Override with project-specific data
Wheeling concession 0% — Assumption ClimeQuant assumption, Override with project-specific data

National

Ministry of Power, CEA
ParameterValueIn forceConfidenceSource
Minimum load for green energy open access 100 kW — Regulator document Ministry of Power, Government of India, G.S.R. 418(E), notified 06-Jun-2022 (as amended)
Grid CO₂ emission factor
CEA v22.0 (FY 2025-26 data). Previous versions: v21.0 0.710 (FY 2024-25), v20.0 0.727 (FY 2023-24).
0.675 tCO2/MWh — Regulator document Central Electricity Authority (CEA), User Guide v22.0, Aug-2026, Table S p.1 and Annexure-I p.22 (v21.0: 0.710
ISTS charge waiver for solar & wind, by commissioning date
COD 01 Jan 2000 – 30 Jun 2025 0% payable
COD 01 Jul 2025 – 30 Jun 2026 25% payable
COD 01 Jul 2026 – 30 Jun 2027 50% payable
COD 01 Jul 2027 – 30 Jun 2028 75% payable
COD 01 Jul 2028 – onwards 100% payable
—Order reportedMinistry of Power, Government of India, MoP order (2021, as amended): 25% of ISTS charges for COD 01-Jul-2025–30-Jun-2026, 50% for 01-Jul-2026–30-Jun-2027, 75% for 01-Jul-2027–30-Jun-2028, 100% thereafter

How to read the confidence labels

  • Regulator document read from the regulator's or licensee's own published order
  • Order reported the order is identified, and the value is confirmed by two or more trade reports of it
  • Being verified from a secondary summary; being checked against the order
  • Assumption an engineering or market default, not a regulated value
  • Not loaded not yet in our library; our calculator warns when it is used

Wheeling charges and losses apply only to consumers supplied below the state's EHV threshold (66 kV in the states shown). Transmission charges billed per MW per day are converted to ₹ per unit in our calculator using the plant's capacity factor.